Manilva’s AP-7 Toll Plaza Expands to 23 Lanes with €7.1 Million Investment
Manilva is significantly enhancing its road infrastructure, marked by a substantial €7.1 million expansion of the AP-7 toll plaza to 23 lanes. Local improvements include the reopening of Calle Jade and the second phase commencement of the Manilva-Sabinillas pedestrian path. These upgrades promise smoother commutes and improved connectivity for residents and visitors alike.
Manilva is making significant strides in enhancing its road network, ushering in a new era of improved connectivity and smoother travel across the municipality. Recent and ongoing infrastructure projects, spearheaded by both national operators and the local Ayuntamiento, highlight a strong commitment to modernising and expanding essential transport links for residents and visitors alike.
A cornerstone of these upgrades is the planned expansion of the AP-7 toll plaza in Manilva, a crucial gateway for travel along the Costa del Sol. Autopistas del Sol, the concessionaire for the AP-7 motorway, has committed over €7.1 million to this ambitious project.3 The aim is to significantly increase the plaza’s capacity to 23 lanes, with up to 17 able to operate simultaneously, a move designed to alleviate congestion, particularly during peak seasons. This major initiative, announced in August 2026, includes the addition of new dynamic, multi-category, manual, and automatic lanes, alongside enhanced safety measures and reconfigured access points. The construction blueprint outlines a 14-month programme, promising a more efficient and streamlined journey for thousands of motorists daily.3
Beyond the primary highway, the Ayuntamiento de Manilva has been actively implementing a series of local road and urban improvements:
- Calle Jade Reopens: The vital Calle Jade in the Los Hidalgos urbanisation officially reopened to traffic on October 7, 2026, following extensive paving and widening works by the Ayuntamiento de Manilva.1 This upgrade significantly improves access and navigability within this residential area.
- Manilva-Sabinillas Pedestrian Path: The second phase of the pedestrian path connecting Manilva with San Luis de Sabinillas commenced on September 25, 2026.2 This project builds upon an initial phase started in March 2023, aiming to create a safer and more pleasant route for pedestrians and cyclists, fostering sustainable mobility and stronger community links.
- New Road in Sabinillas: Manilva Town Council continues to improve road infrastructure with the creation of a new road on Isaac Peral Street in Sabinillas. This new connection will directly link the area with the town centre, promoting more comfortable and safer traffic flow.
- Chullera Service Road and Parking: Infrastructure Councillor Marcos Ruiz oversaw the commencement of urbanisation works in the AL-5 sector, known as “Camping Chullera II”. This project will create a new service road and 100 free access parking spaces, significantly enhancing access and mobility in this part of the municipality.
- Local Street Improvements: Additional local road paving has recently been completed in areas such as Río Manilva and from the Manilva entrance roundabout to Camino de la Mar, as of October 3, 2026. Furthermore, the Councillor for Infrastructure, Works and Urbanisations, Marcos Ruiz, inspected various ongoing works in May 2026, including the removal of old planters and replacement with textured concrete on the ascent to Princesa Kristina for wider, more accessible pavements, and the installation of new drains in Altos de Princesa Kristina to address rainwater accumulation. Drainage along the A-377 road between Manilva and Sabinillas has also been improved with a new soft ditch to prevent blockages.
These forward-looking infrastructure developments are excellent news for foreign buyers and owners considering a new-build home in Manilva. The enhanced AP-7 access will mean smoother commutes and quicker connections to key destinations along the Costa del Sol, including airports and major cities. Locally, the upgraded streets, expanded parking, and new pedestrian paths contribute to a higher quality of life, offering residents better access to amenities and more opportunities for outdoor activities. These improvements not only boost daily convenience but also support the long-term value and appeal of the developments we recommend in Manilva.
Frequently asked questions
What is the biggest infrastructure project underway in Manilva?
The most significant project is the expansion of the AP-7 toll plaza in Manilva, which will increase its capacity to 23 lanes, improving traffic flow and reducing congestion.
How much is being invested in the AP-7 toll plaza expansion?
Autopistas del Sol, the operator of the AP-7, is investing over €7.1 million in the expansion and modernisation of the Manilva toll plaza.
When did Calle Jade in Los Hidalgos reopen after improvements?
Calle Jade in the Los Hidalgos urbanisation reopened to traffic on October 7, 2026, following extensive paving and widening works.
What is the latest update on the Manilva-Sabinillas pedestrian path?
The second phase of the pedestrian path connecting Manilva with San Luis de Sabinillas commenced on September 25, 2026, continuing a project initiated in March 2023.
Are there other local road improvements happening in Manilva?
Yes, additional local road paving has been completed in areas like Río Manilva and near the Manilva entrance roundabout as of October 3, 2026. Projects also include a new service road in Chullera and improvements on Isaac Peral Street in Sabinillas.
How will these road improvements benefit residents and new home buyers in Manilva?
These infrastructure upgrades will lead to smoother commutes, easier access to amenities, and enhanced connectivity across the region. They also contribute to a higher quality of life and the long-term appeal of properties by offering better travel efficiency and options for sustainable mobility.