Malaga Airport Secures €830 Million, Boosts Capacity to 36 Million by 2031
Malaga-Costa del Sol Airport has secured an investment of €830 million for its expansion under Aena's DORA III plan, covering the period 2027 to 2031. This significant funding aims to boost the airport's annual passenger capacity to 36 million and will lead to extensive terminal area increases and operational improvements. The project highlights Malaga's growing importance as a key international gateway to the Costa del Sol.
Malaga-Costa del Sol Airport is set for a substantial upgrade, with the Spanish government approving an investment of €830 million for its expansion under Aena’s Airport Regulation Document III (DORA III) plan for 2027-2031.1 This considerable funding marks a pivotal step in the airport’s transformation, aiming to increase its annual passenger capacity to 36 million.
The approved investment forms the initial phase of a broader €1.5 billion expansion project, which will continue beyond 2031. This development reflects the airport’s surging passenger numbers; Malaga handled a record 26.76 million passengers in 2025 and 19.32 million between January and August 2026 alone, solidifying its position as Spain’s fourth busiest airport.

Key Enhancements for a Modern Travel Experience
The expansion plans are comprehensive, focusing on significantly improving the passenger experience and operational efficiency. The terminal area is projected to grow from approximately 80,000 square metres to a substantial 140,000 square metres. This near-doubling of space will facilitate smoother passenger flow and accommodate the rising demand.
Specific improvements include:
- A new pier dedicated to non-Schengen traffic, featuring centralised border control facilities.
- A significant expansion of the security screening area, increasing by 112%, alongside a 515% increase in departure passport control capacity.
- More aircraft contact positions and an enhanced baggage-handling system.
- Enlarged areas for passenger services and commercial activity, growing by 41%, with VIP lounge space increasing by approximately 43%.
- Improvements to external infrastructure, including new taxiways, better access roads, and expanded parking facilities.
Aena and the Spanish government anticipate that major physical construction will commence around 2028, with the entire project expected to unfold in phases into the 2030s.2 Crucially, the airport will maintain full operational status throughout the construction period, ensuring minimal disruption to travellers.2
Benefits for Costa del Sol Residents and Owners
For foreign buyers and existing owners of new-build properties on the Costa del Sol, this significant investment in Malaga Airport underscores the region’s commitment to world-class connectivity and infrastructure. Improved airport facilities mean a more seamless and efficient travel experience, whether arriving for a holiday, visiting a second home, or residing permanently. The increased capacity and enhanced services not only make travel to and from Malaga more convenient but also reinforce the region’s appeal and accessibility, potentially strengthening property values by ensuring robust transport links to key international destinations, particularly the UK, which remains the largest international market for the airport.3
Frequently asked questions
How much is being invested in the Malaga Airport expansion?
The Spanish government has approved an investment of €830 million for Malaga-Costa del Sol Airport under Aena's DORA III plan for 2027-2031. This is part of a larger €1.5 billion expansion project.
What is the target passenger capacity for Malaga Airport after the expansion?
The expansion aims to increase Malaga Airport's annual passenger capacity from approximately 30 million to 36 million.
When will the main construction work for the expansion begin?
Major physical construction for the Malaga Airport expansion is expected to begin around 2028. The full project will be completed in phases, extending into the 2030s.
What are the main improvements included in the expansion plans?
Key improvements include a significant increase in terminal area to 140,000 square metres, a new pier for non-Schengen traffic, expanded security and passport control areas, more aircraft contact positions, and enhanced baggage handling systems. Commercial and VIP lounge spaces will also be enlarged.
Will the airport remain open during the construction?
Yes, Malaga-Costa del Sol Airport will remain fully operational throughout the construction period to ensure minimal disruption to travellers.